PROJECTS

CONSTRUCTION SITE WORK


Client: GTI Properties

Utility Installation and Parking Lot Construction

For a parking lot rennovation project, Dowling Corporation installed domestic water and fire suppression supply lines, and site drainage and sewer lines. The project was completed on time, allowing the owner use of the parking lot as rental spaces prior to the January 1st deadline.

This project involved:

  • Apply for and obtain all necessary permits and inspections with Boston Water & Sewage
  • Excavation, installation and backfill of an estimated 1,200 linear feet of 6", 8" and 12" drain line and associated catch basins; drain manholes and oil water separator
  • Excavation, installation and backfill of an estimated 350 linear feet of 4" ductile iron domestic water line
  • Excavation, installation and backfill of an estimated 800 linear feet of 8" ductile iron fire suppression line
  • Excavation, installation and backfill of an estimated 800 linear feet of 8" PVC sewer line
  • Install and cap all utilities to the inside of the main building for connection by others
  • Re-grade the area, install suitable sub-grade material and resurface the entire parking lot